Build order
You might say: opening, production order, opening book
A timed sequence of workers, structures, research and units that establishes an opening plan.
- What it does
- Reaches a chosen economic or military state quickly, while leaving enough flexibility to respond when scouting contradicts the opening.
- Ask
- What should be started next so prerequisites, income and timing reach the intended state before the opponent can answer?
- Trouble
- A fixed opening reaches the wrong technology or army when the opponent takes a different line.
What to look for
- A visible queue follows a repeatable opening sequence
- Prerequisite structures appear before advanced units
- A first force or expansion arrives at a deliberate time
Parts
- Opening-book exits: The process that decides when a fixed opening queue has become stale and either patches a small disruption or replaces the plan.
- Build-order search and continuous optimisation: A planner searches concurrent production actions against a goal or objective instead of replaying a fixed queue.
Catalogue: Timing
- Absolute time: A step scheduled against the game clock, whether it happens immediately or at a named time. It counts as absolute-time timing when the command is keyed to a clock value rather than to a game event.
- Event trigger: A step released by a condition in the running game, such as a completed building, a trained villager or a depleted resource. It counts as event-triggered timing when the next command waits for an observed state change instead of a fixed clock value.
Sources
- David Churchill and Michael Buro, Build Order Optimization in StarCraft, Introduction, p. 1
The order in which units and structures are produced is called a build order.
- David Churchill and Michael Buro, Build Order Optimization in StarCraft, Abstract, p. 1
We consider the build order problem in RTS games in which we need to find concurrent action sequences that, constrained by unit dependencies and resource availability, create a certain number of units and structures in the shortest possible time span.
- Santiago Ontañón et al., A Survey of Real-Time Strategy Game AI Research and Competition in StarCraft, Section III-A, p. 5
The build-order is the specific sequence in which buildings of different types will be constructed at the beginning of a game, and completely determines the long-term strategy of a player.
- David Churchill, UAlbertaBot source code, ProductionManager.cpp, update() and detectBuildOrderDeadlock()
if (Config::Debug::DrawBuildOrderSearchInfo) { BWAPI::Broodwar->printf("Supply deadlock detected, building supply!"); } m_queue.queueAsHighestPriority(MetaType(BWAPI::Broodwar->self()->getRace().getSupplyProvider()), true);
- David Churchill, UAlbertaBot source code, ProductionManager.cpp, detectBuildOrderDeadlock()
if ((supplyAvailable < supplyCost) && !supplyInProgress)
Use it on your project
teardown-apply: hold "Build order" (build-order) from the teardown at https://teardownatlas.com/game-ai/ against my project
Paste it into a coding agent that has the teardown skills.
An AI agent wrote this map with the teardown skill. It can contain errors: check the sources before you rely on a part. About and legal